Committed to Excel Promise of Quality to Achieve
International Benchmarks and Recognition
Ori-Plast has successfully completed the job of Sea Water Intake Systems on turnkey basis, by using 450mm OD HDPE pipes with specially designed suction blocks for M/s. Thappar Water Base, Chennai.
HDPE pipes supplied by Ori-Plast have been used by The Indian Iron & Steel Co. Ltd., in their collieries in Bihar for Sand Stowing purpose. The Steel Pipes, previously used for the same purpose, were found to have a service life of only 6 – 12 months. The 180mm OD & 10 kg/cm 2 HDPE Pipes scored over the steel pipes for their absolute corrosion resistance, higher service life and 60% lower weight.
Ori-Plast has successfully completed a turnkey job of 250mm HDPE pipeline system for M/s. Manali Petro Chemicals Ltd., Chennai (a SPIC Group Company) for disposal of their effluents from their factory at Manali to the sea covering a total distance of 6 km (of which 5.4 km on shore and 0.6 km off shore). At the end of the piping system, a Diffuser of multi port type designed by us was fitted to spray the effluents into the sea.
Ori-Plast has supplied 1750m of 500mm OD and 6 kg/cm2 working pressure HDPE pipes with floaters worth Rs.1.11 Crores to M/s. Dredging Corporation of India Ltd., Visakhapatnam. The specialty of the system was that, it could be assembled and maintained in the floating condition with a zero maintenance cost.
Ori-Plast had undertaken a project worth Rs. 70 Lakh for Boiler Ash Disposal System in Tuticorin Thermal Power Station, Tuticorin, Tamil Nadu where HDPE pipes and fittings up to 500mm OD and of working pressure 10 kg/cm2 were used.